Page 1 | 2 | 3 | 4
Project : Cadangan Project Makmal Kawalan Mutu Ikan(FIQC) Wilayah Timur Kuantan, Negeri Pahang Darul Makmur

Client/Main Contractor :
Marimas Sdn. Bhd.

Contract Amount :
RM 9.8 million

Project Duration:
84 Weeks

Scope of Works :
  • Civil and Structural works
  • Architechural works
  • Mechanical and Electrical works
  • External works


:: Click on image to enlarge
     
Project : Mycron Steel- Upgrading Of Plant. Combined Skin & Tension Leveling Line
- MIE 1819BC-New H2 Batch Annealing Furnaces-Civil Works as Additional Works to MIE 1819TC


:: Click on image to enlarge

Client/Main Contractor :
Melewar Integrated Engineering Sdn. Bhd/ Marimas Sdn. Bhd.

Contract Amount :
RM 4.1 million

Project Duration :
5 months

Scope of Works :
  • Soil Nailing to existing RC Wall
  • Concrete Cutting to existing slab (450mm thick) for sheet piling & slab removal
  • Sheet piling works
  • Excavation and removal of earth at 8m deep
  • Provide centre platform inside existing plant for sheet piling and concrete casting
  • Breaking up of existing 600mm wall by hydraulic circular jack
     
Project : The proposed Combined Skin Pass & Tension Leveling Line
- Contract For Civil & Building Works -MIE1819BC

Client/Main Contractor :
Melewar Integrated Engineering Sdn. Bhd/ Marimas Sdn. Bhd.

Contract Amount :
RM 15.8 million

Project Duration:
12 months

Scope of Works :
  • Dilapidation Survey
  • Vibration measurement to RC piling and sheet pile works
  • RC piling works
  • Sheet pile and strutting works
  • Steel structure installation with roof ventilator
  • Siphonic system for roof drainage
  • Installation of 1m length, 36mm diameter anchor bolts (488nos) embedded into concrete with allowable deviation of +-3mm
  • Raised floor for centre control room
  • Fire Fighting works
  • Air Conditioning Works
  • Electrical Works
  • Coring Holes ( 1,200nos) for machine installation


:: Click on image to enlarge
     
Project: The Proposed 30 Units Shop With One Basement Carpark On Lot PT 68-81, Mukim Damansara, Daerah Petaling
- Main Building Works


:: Click on image to enlarge

Client:
Rayon Development Sdn. Bhd

Contract Amount :
RM 18.95 million

Project Duration :
12 months

Scope of Works :
  • Architectural Works
  • Civil and Structural Works
  • Basement Carpark Epoxy Flooring
  • Decorative Concrete Imprint
  • External Water Reticulation & Sewerage Works
  • Fire Protection Installation
  • Air Conditioning Works
  • Cold Water & Sanitary Services Installation
  • Lift Services Installation
  • Electrical and Telephone System
  • Fabrication and Installation of Roofing System
     
Project: Cadangan Membina Dan Menyiapkan Kompleks Pejabat Pertanian Daerah Di Seksyen 19, Bandar Baru Kuala Selangor Daerah Kuala Selangor, Selangor Darul Ehsan

Client :
Plot Power (M) Sdn. Bhd.

Contract Amount :
RM 5.9 million

Project Duration :
11 months

Scope of Works :
  • Civil and Structure Works
  • Mechanical And Electrical Works
  • Infrastructure Works


:: Click on image to enlarge
     
Project: 3 x 700MW Coal Fired Power Plant At Tanjung Bin, Johor Darul Takzim, Package B1 - Main Civil Works For Steam Turbine And Auxiliaries Structure


:: Click on image to enlarge

Client :
Zelan Construction Sdn. Bhd.

Contract Amount :
RM 65.25 million

Project Duration :
24 months

Scope of Works :
  • RC Work to machine pit at 7.6m deep
  • Sheet Piling and Strutting Works
  • Installation of heavy duty tubular scaffold for turbine table (height : 22meter)
  • Installation of steel embedded plate to turbine table face
  • Installation of embedded anchor bolt 1.2m long, 48mm diameter with +-3mm tolorence
  • Single casting to pit with concrete volume 2800m?
     
Projects: Cadangan Pembangunan Kampus Tetap Kolej Pengurusan Bisness Universiti Tenaga Nasional (UNITEN) Di Bandar Muadzam Shah, Pahang- Asrama Pelajar (Fasa 2)

Client :
Tenaga Nasional Berhad / Marimas Sdn. Bhd.

Contract Amount :
RM 16.3 million

Project Duration :
12 months

Scope of Works :
  • Civil and Structure Works
  • Mechanical And Electrical Works
  • Infrastructure Works


:: Click on image to enlarge
     
   
Page 1 | 2 | 3 | 4